How a conversation on a coffee walk turned into the decision to rebuild Hatch from scratch in under two weeks, and the two mistakes we fixed once the work began.
Where do big ideas come from?
Showers, 3am inspiration, a wandering mind reading a book, something a friend said that made you think?
This one happened on a walk to get coffee.
Three months ago we were in a tricky spot as a business.
After a funding round we had defined the next horizon of our product, but a few months into building it felt like trying to swim up a waterfall. Our code base was holding us back, we were going too slow, we were never going to get it to market in the timeframe.
Three months later we are building “Hatch 4.0” at warp speed. Here's how we got from that tricky point a few months ago, to where we are now.
In late August, I was getting a coffee with Sam and Pete from our product team. We were admiring how fast Brian Swift and his team have built Twine and Sam said, “yeah but it’s easy to build fast from greenfield”.
It made me stop and think. Should we build Hatch 4.0 from greenfield, throw out our code base and build from zero? “Shut up Adam!” was the general response and we kept walking. But the seed was planted.
A few more weeks and more upwards swimming, I got more serious about the idea. The leadership team responded with a mix of excited curiosity and cautiousness. We gave ourselves nine business days to get to an answer.
At first we cordoned off Sam our Product Manager for a deep dive. He was then joined by Arwen our new Head of AI/ML and acting CTO (talk about being thrown in the deep end!) and three tech leads Adam, Peter, Rob. Arwen ran the technical investigation process which was a godsend - you need someone in charge of something like this.
We considered three scenarios and stress tested them with external CTO experts. Everyone shared war stories that gave me nightmares for days, but everyone agreed building 4.0 from scratch was the right call.
Taryn, our partner from our lead VC Rampersand, was excited and supportive. I felt a touch nervous sending this message. Having that alignment meant the world.

It hadn’t even been two weeks, but the confidence had built across tech leadership. I gathered together our tech leaders, including Ash our incoming CTO, and we all gave the “go” sign.

Sharing the news with the team felt amazing, like we were putting our destiny back in our hands, like we were inverting the waterfall and about to power down it.

In the end, we started our technical investigation on 27 Aug, made the decision on 6 Sept, ground work began 9 Sept, and full work began 16 Sept.
We kicked off the project with a bang. A full strategy day talking about why we’re all at Hatch, what this next version means for the community we serve, and figuring out how we’ll work together to make this magic.


The team had a full range of emotions. See a few of their reactions in this instagram vid!
Asking them all to not take leave before xmas didn’t feel great, but they were on board.

How do you pull a project like this off at warp speed?
To start, we split the tech team into two with a smaller group building the new “Hatch 4.0” foundations before bringing in the rest. This seemed smart but within a few weeks people were in and out of the loop, and no one likes that.
We fixed that by introducing weekly all tech team project meetings and daily standups, irrespective of if you’re on the project. That got the tech team on the same page.
A few weeks later the same issue occurred with our growth team. They were still focused on growing our “3.0” product and were in the dark on product and design decisions for “4.0”.
We fixed that by introducing a company-wide project plan. This was something we delayed doing, we wanted to first figure out the pieces to be built. But that delay created opaqueness around the project status and much anxiety. Turns out you always need a plan, even if you change it regularly.
So Sam plotted a detailed timeline with all the work required by both the product and growth teams. Getting on top of that took some time but now it’s enabled us to create a simplified version that we put on the office wall for everyone to understand.
Each Friday we celebrate progress by moving things forward in the timeline. It’s made a huge difference to everybody feeling connected.

The timeline gave us four months to re-imagine four big pillars of how people find jobs.
But more on that next week…